Baker Hughes Begins First Field Trial of its LEAP Adaptive Production System

HOUSTON—(January 07, 2016) – Baker Hughes announced today that the first field trial of its LEAP™ adaptive production system, installed on December 12 at a depth of 5,200 feet in the Mississippi Lime play in Woods County…



Baker Hughes Trade Releases

Leave a Reply

Your email address will not be published. Required fields are marked *