Record-breaking lift completes the Johan Sverdrup field centre

Three days – that’s what it took to lift four of the last pieces in the Johan Sverdrup puzzle into place – the two final platform topsides, a bridge and a flare stack. The processing platform lift was the heaviest lift ever performed offshore.



Statoil - All News

Leave a Reply

Your email address will not be published. Required fields are marked *